logo

Little Salmon Carmacks First Nation (LSCFN) Water Treatment Plant Upgrades

Sector: Chemical (Industrial) • Location: Yukon, Canada

Source: Infrastructure Canada

Project
Completed

Yukon Government’s Environmental Health department conducted an inspection of the Little Salmon Carmacks First Nation (LSCFN) water treatment plant (WTP) in 2017 and an engineering assessment was subsequently conducted to address the deficiencies noted in that report. To address these deficiencies, and after consulting with LSCFN, the recommended upgrades include the following: -Purchase of a back

Project Information FAQ

Project Information

3 Q
The project “Little Salmon Carmacks First Nation (LSCFN) Water Treatment Plant Upgrades” is an infrastructure initiative in the Chemical (Industrial) sector, located in Yukon, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Yukon Government’s Environmental Health department conducted an inspection of the Little Salmon Carmacks First Nation (LSCFN) water treatment plant (WTP) in 2017 and an engineering assessment was subsequently conducted to address the deficiencies noted in that report. To address these deficiencies, and after consulting with LSCFN, the recommended upgrades include the following: -Purchase of a backup well pump; -Replacement of the existing non-compliant greensands filter media; -Replacement of the existing non-validated UV system to meet primary disinfection requirements; -Replacement of chlorine dosing system to meet secondary disinfection requirements; -Upgrade of instrumentation and controls, including the supervisory control and data acquisition (SCADA) system and programmable logic controller (PLC); -Truckfill and distribution upgrades; -Replacement of some existing piping and equipment; and -New fume hood and chemical storage. The LSCFN WTP was built in 2011 and is considered a Large Public Drinking Water system as it has more than five service points for bulk water delivery. The engineering report is currently complete at 30% and thus funding for this project will be required for detailed design and construction.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data