logo
ProjectClosed

Liuhe MSW-fired Cogeneration PPP project

One of 10,000+ projects Taiyo tracks in China.

Source: InfraPPPWorld

The project has a designed daily household waste processing capacity of 500 tonnes. The new facilities will be built on a BOO basis as well, with a concession period of 30 years. In addition, it is expected to generate approximately 7,000,000 kWh of green electricity and 260,000 tonnes of steam annually.

Status
Closed
Sector
Power Generation (CCGT), Water Supply and Storage
Location
China
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Liuhe MSW-fired Cogeneration PPP project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Liuhe MSW-fired Cogeneration PPP project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in China. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project has a designed daily household waste processing capacity of 500 tonnes. The new facilities will be built on a BOO basis as well, with a concession period of 30 years. In addition, it is expected to generate approximately 7,000,000 kWh of green electricity and 260,000 tonnes of steam annually.

Original sector

Water & Waste

Procurement method

Budget

Location

Country

China

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Water Supply and Storage

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project