Live Oak Boulevard Water Main Replacement
Sector: Water Supply and Storage • Location: Gretna, Louisiana, United States of America
Source: Dodge
The project consists of abandonment of existing PCCP water main, installation of new 36" PVC and 42" HDPE water main by open cut and horizontal directional, and asphalt pavement and aggregate drive replacement over trenches.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road, Commercial, Government
- Location
- Gretna, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Live Oak Boulevard Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of abandonment of existing PCCP water main, installation of new 36" PVC and 42" HDPE water main by open cut and horizontal directional, and asphalt pavement and aggregate drive replacement over trenches. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Gretna |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road, Commercial, Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
