logo

LIVESTOCK II

Sector: Raw Materials • Location: Korea, Republic of

Source: World Bank Group

Project
Closed

The proposed project would consist of: (a) the establishment of about 450 new dairy farms each of which would initially have 8 heifers (estimated cost: $11.2 million, including contingencies); (b) the continuation of the development begun as part of the (First) Integrated Dairy Beef Project on about 400 dairy farms by increasing the numbers of heifers on each to ensure their long-term financial vi

Project Information FAQ

Project Information

5 Q
The project “LIVESTOCK II” is an infrastructure initiative in the Raw Materials sector, located in Korea, Republic of. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project would consist of: (a) the establishment of about 450 new dairy farms each of which would initially have 8 heifers (estimated cost: $11.2 million, including contingencies); (b) the continuation of the development begun as part of the (First) Integrated Dairy Beef Project on about 400 dairy farms by increasing the numbers of heifers on each to ensure their long-term financial viability (estimated cost $2.7 million, including contingencies); (c) (i) the expansion of existing processing plants which produce baby milk-powder, sterilized fluid milk, and whole milk powders; (ii) the diversification of present plants to include production of butterfat, evaporated milk, and powdered coffee creamer; (iii) the establishment of two milk collection centers; (iv) the provision of approximately 50 small milk cooling units; and (v) the construction of a frozen milk products plant at Yeongnam (estimated cost: $8.8 million, including contingencies); and (d) the expansion of technical services for both farm development and milk processing (estimated cost: $1.8 million, including contingencies).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data