logo

Livingston Wind Power Plant Acquisition

Planned · United States · Last reported May 2025

Source: Cardinal News

Project
Planned

Appalachian Power hopes to acquire the 255-megawatt Livingston Wind power plant in Illinois, which is scheduled to begin operation in 2029. The project qualifies for compliance with Virginia’s environmental mandate as it is located within the PJM region.

Status
Prospective
Sector
Wind, Power Generation (CCGT)
Location
United States of America
Updated
22 Jul 2026
Source
Cardinal News

ConstructChat

Ask ConstructChat about Livingston Wind Power Plant Acquisition

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Livingston Wind Power Plant Acquisition” is an infrastructure initiative in the Wind sector, located in United States. Taiyo aggregates data on it from Cardinal News.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Appalachian Power hopes to acquire the 255-megawatt Livingston Wind power plant in Illinois, which is scheduled to begin operation in 2029. The project qualifies for compliance with Virginia’s environmental mandate as it is located within the PJM region.

Original sector

Energy

Location

Country

United States of America (USA)

Source

Source

Cardinal News

URL

More Details

Record type

Project

Sector

Wind, Power Generation (CCGT)

Article published date

2025-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project