Livingston Wind Power Plant Acquisition
Sector: Wind • Location: Illinois, United States
Source: Cardinal News
Appalachian Power plans to acquire the 255-megawatt Livingston Wind power plant in Illinois, which is under development by EDF Renewables and scheduled to begin operation in 2029. The acquisition is subject to regulatory approval and conditions including not exceeding the estimated $1.07 billion price and receiving significant federal tax credits.
- Status
- Prospective
- Sector
- Wind, Power Generation (CCGT)
- Location
- Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Cardinal News
ConstructChat
Ask ConstructChat about Livingston Wind Power Plant Acquisition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Appalachian Power plans to acquire the 255-megawatt Livingston Wind power plant in Illinois, which is under development by EDF Renewables and scheduled to begin operation in 2029. The acquisition is subject to regulatory approval and conditions including not exceeding the estimated $1.07 billion price and receiving significant federal tax credits. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
Source
Source | Cardinal News |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT) |
Article published date | 2025-11-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States
- Union Power Project El Dorado AR
- I-485 Charlotte Outer Loop, North Carolina
- Goethals Bridge Replacement Project, New York
- Northeast Supply Enhancement (NESE) Project
- Dominion Cove Point Liquefaction Project, Chesapeake Bay
- Starbucks Coffee Roasting Plant
- EPC of Turbine and Foundation Structure in the Southwest Sea Wind Power Demonstration Complex
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
