logo

Lixin Country National Trunk Line

Sector: Road • Location: China

Source: World Bank Group

Project
Active

The project entails :

  1. New construction of the G329 Lixin Ring Road section. The total length of the project is about 17.006 kilometers, including 7.784 kilometers of new road sections and 1.943 kilometers of new municipal sections, of which the bridge length is 343.36 meters.
  2. The second phase of the S339 Lixin section reconstruction project starts from the end of the first phase of K9+800 a
Status
Prospective
Sector
Road, Warehouse, Bridge, Government, Commercial
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Lixin Country National Trunk Line

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Lixin Country National Trunk Line” is an infrastructure initiative in the Road sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails : 1) New construction of the G329 Lixin Ring Road section. The total length of the project is about 17.006 kilometers, including 7.784 kilometers of new road sections and 1.943 kilometers of new municipal sections, of which the bridge length is 343.36 meters. 2) The second phase of the S339 Lixin section reconstruction project starts from the end of the first phase of K9+800 and ends at the Yudong District of Fuyang City, with a total length of 4.477 kilometers. 3) The second phase of the S338 Lixin section reconstruction project starts from the first phase of the construction project. The end point is located in Zhangcun Town and intersects with the current S202 plane. The terminal number is K31+010, and the total length of the route is about 16.019 kilometers. 4) S444 Lixin section reconstruction project, the starting point of this section is located on the east bank of Ganghe River (to be upgraded to S444 in Mengcheng City), and the end point is to the current situation S308 (station K76+912) on the north side of Xinhe Village, with a total length of 8.791 kilometers. 5) Xi'an River Shaodukou Bridge construction project, the starting point of this section is set on the west side of the former Duzhuang (connected to the current 220 township road), and the end point is to the 104 township road on the west side of Lishui Village. The total length of the route is about 2.120 kilometers, of which the bridge The length is about 500 meters. 6, S247 (formerly X048 Wanghu Road) Mahu Bridge reconstruction project, located in the planning S247 (formerly County Road X048), the north-south direction is respectively connected to the provincial road S305 and the provincial road S340, the total length of the line is about 877 meters, of which the length of the bridge 377 meters. Sponsor of the project is Anhui Transportation Logistics Engineering Co. (90 %), government company responsible for the implementation is Lixin County Urban and Rural Construction Investment Co., Ltd. (10 %) , Ltd. Total project cost is $ 150.45 million. The BOT concession has a duration of 15 years.Financial close took place on October 26, 2018. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=0a571aa2c240403a944cfc66e6008de4

Original sector

Transport

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Warehouse, Bridge, Government, Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project