Lixin Country National Trunk Line
Sector: Road • Location: China
Source: World Bank Group
The project entails :
- New construction of the G329 Lixin Ring Road section. The total length of the project is about 17.006 kilometers, including 7.784 kilometers of new road sections and 1.943 kilometers of new municipal sections, of which the bridge length is 343.36 meters.
- The second phase of the S339 Lixin section reconstruction project starts from the end of the first phase of K9+800 a
- Status
- Prospective
- Sector
- Road, Warehouse, Bridge, Government, Commercial
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Lixin Country National Trunk Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails : 1) New construction of the G329 Lixin Ring Road section. The total length of the project is about 17.006 kilometers, including 7.784 kilometers of new road sections and 1.943 kilometers of new municipal sections, of which the bridge length is 343.36 meters. 2) The second phase of the S339 Lixin section reconstruction project starts from the end of the first phase of K9+800 and ends at the Yudong District of Fuyang City, with a total length of 4.477 kilometers. 3) The second phase of the S338 Lixin section reconstruction project starts from the first phase of the construction project. The end point is located in Zhangcun Town and intersects with the current S202 plane. The terminal number is K31+010, and the total length of the route is about 16.019 kilometers. 4) S444 Lixin section reconstruction project, the starting point of this section is located on the east bank of Ganghe River (to be upgraded to S444 in Mengcheng City), and the end point is to the current situation S308 (station K76+912) on the north side of Xinhe Village, with a total length of 8.791 kilometers. 5) Xi'an River Shaodukou Bridge construction project, the starting point of this section is set on the west side of the former Duzhuang (connected to the current 220 township road), and the end point is to the 104 township road on the west side of Lishui Village. The total length of the route is about 2.120 kilometers, of which the bridge The length is about 500 meters. 6, S247 (formerly X048 Wanghu Road) Mahu Bridge reconstruction project, located in the planning S247 (formerly County Road X048), the north-south direction is respectively connected to the provincial road S305 and the provincial road S340, the total length of the line is about 877 meters, of which the length of the bridge 377 meters. Sponsor of the project is Anhui Transportation Logistics Engineering Co. (90 %), government company responsible for the implementation is Lixin County Urban and Rural Construction Investment Co., Ltd. (10 %) , Ltd. Total project cost is $ 150.45 million. The BOT concession has a duration of 15 years.Financial close took place on October 26, 2018. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=0a571aa2c240403a944cfc66e6008de4 |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Warehouse, Bridge, Government, Commercial |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in China
- Beilungang CoalFired
- Wensu County Rural Roads Construction Project
- Huaxi section, part of the southern section of Huaguan Road
- Dongming County Highway
- Ji'an City urbanization project
- Wenzhou Oujiang Belt Expressway to Woqi Section and Oujiang Road East Extension
- Roadway No. 321 (Wuzhou Section)
- Shen-Shan Highway (Eastern Section)
