LLNL New Employee Center Building 460
Sector: Water Supply and Storage • Location: Livermore, California, United States of America
Source: Dodge
The objective of the project is to build a new ~23,564 gsf ground-up two-story fitness and amenity Employee Center building and associated site improvements. The work includes, but is not limited to grading, earthwork, site utilities, paving and drive aisles, concrete foundation and slab, CMU and framed exterior walls, insulated metal panel wall system, storefront and curtain wall window system wi
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Steel, Cement, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Residential
- Location
- Livermore, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about LLNL New Employee Center Building 460
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the project is to build a new ~23,564 gsf ground-up two-story fitness and amenity Employee Center building and associated site improvements. The work includes, but is not limited to grading, earthwork, site utilities, paving and drive aisles, concrete foundation and slab, CMU and framed exterior walls, insulated metal panel wall system, storefront and curtain wall window system with insulated low-E glass, structural steel roof framing and columns, single-ply roofing system ov... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Livermore |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Steel, Cement, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Residential |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
