logo
ProjectPlanning Schematics

Lo Herma Uranium Project

Planning schematics · Wyoming · Last reported Sep 2025

Source: Dodge

ISR operation with a central processing plant, a JORC resource estimate of 8.7Mlbs U3O8, and a 7-year mine life with an annual production target of 800,000 lbs U3O8. Mineral resource expansion, drilling, and further analysis.

Status
Prospective
Sector
Nuclear, Power Generation (CCGT), Commercial
Location
Antelope Hills, Wyoming, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Lo Herma Uranium Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lo Herma Uranium Project” is an infrastructure initiative in the Nuclear sector, located in Antelope Hills, Wyoming, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

ISR operation with a central processing plant, a JORC resource estimate of 8.7Mlbs U3O8, and a 7-year mine life with an annual production target of 800,000 lbs U3O8. Mineral resource expansion, drilling, and further analysis.

Budget

Location

Country

United States of America (USA)

State

Wyoming

City

Antelope Hills

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Nuclear, Power Generation (CCGT), Commercial

Article published date

2025-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project