logo

Lo Saldes Bridge Replacement in Santiago

Sector: Bridge • Location: Chile

Source: InfraPPPWorld

Project
Project In Construction

The project involves the complete replacement of the superstructure of the Lo Saldes Bridge in Santiago, Chile, as part of a major infrastructure modernization initiative led by the Chilean Ministry of Public Works (MOP). With an investment exceeding US$16 million, the works are aimed at restoring the bridge’s structural integrity and improving its seismic resistance after a structural failure was

Project Information FAQ

Project Information

4 Q
The project “Lo Saldes Bridge Replacement in Santiago” is an infrastructure initiative in the Bridge sector, located in Chile. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project in construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the complete replacement of the superstructure of the Lo Saldes Bridge in Santiago, Chile, as part of a major infrastructure modernization initiative led by the Chilean Ministry of Public Works (MOP). With an investment exceeding US$16 million, the works are aimed at restoring the bridge’s structural integrity and improving its seismic resistance after a structural failure was detected in early 2025. The intervention includes dismantling the existing bridge deck and replacing the original steel girders with new high-strength girders, reinforcing the supporting structures, upgrading the roadway system, and adapting the bridge to current engineering and safety standards. Because the bridge is a key urban connection carrying approximately 50,000 vehicles daily between Providencia, Las Condes, and Vitacura, construction is being executed in phases to maintain traffic flow and minimize disruptions during the estimated 12-month construction period.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data