Loading Dock Concrete Replacement REBID
Closed · Wisconsin · Last reported Jan 2024
Source: Dodge USA
In general the work consists of: Removal and replacement of existing concrete pavement with new 8-inch concrete pavement at four locations totaling approximately 10,800 sq.ft., and the installation of a new 36-inch diameter precast concrete catch basin and approximately 75 feet of new 8-inch PVC storm drain pipe connecting to an existing storm manhole.
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Commercial
- Location
- Oshkosh, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Loading Dock Concrete Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general the work consists of: Removal and replacement of existing concrete pavement with new 8-inch concrete pavement at four locations totaling approximately 10,800 sq.ft., and the installation of a new 36-inch diameter precast concrete catch basin and approximately 75 feet of new 8-inch PVC storm drain pipe connecting to an existing storm manhole. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Oshkosh |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
