Loading Dock Efficiency Improvement
Sector: Metal • Location: Madison, Wisconsin, United States of America
Source: Dodge
In general, the work consists of: Modifications to the loading dock area of 1) moving the trash compactor from its 39 current location to a new door, 2) moving the metal recycling dumpster to a dock door, and 3) adding a manual gate 40 to an existing chain link fence within the building. This will require the removal of some concrete paving and 41 installation of a new slab & retaining wall and a
- Status
- Closed
- Sector
- Metal, Warehouse, Commercial, Cement
- Location
- Madison, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Loading Dock Efficiency Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the work consists of: Modifications to the loading dock area of 1) moving the trash compactor from its 39 current location to a new door, 2) moving the metal recycling dumpster to a dock door, and 3) adding a manual gate 40 to an existing chain link fence within the building. This will require the removal of some concrete paving and 41 installation of a new slab & retaining wall and a new concrete foundation wall with stoop and stairs to grade. 42 Infilling a current dock door ope... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Madison |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Warehouse, Commercial, Cement |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
