logo

LOC Korea wins another subsea cable contract on JANGGAM Solar Project

Sector: Manufacturing (Industrial) • Location: South Korea

Source: Energy Projects & Technology

Project

LOC Korea has been awarded a contract to provide Marine Warranty Surveyor (“MWS”) services for the subsea cable installation on the JANGGAM Solar Project. The Group was appointed by solar industry leader, Topsun Co. Ltd. With limited experience in marine operations, Topsun Co. Ltd., Swiss Re and other reinsurers contracted LOC Korea for the project as a recognised leading MWS service provider for

Project Information FAQ

Project Information

3 Q
The project “LOC Korea wins another subsea cable contract on JANGGAM Solar Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in South Korea. Taiyo aggregates data on it from Energy Projects & Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

LOC Korea has been awarded a contract to provide Marine Warranty Surveyor (“MWS”) services for the subsea cable installation on the JANGGAM Solar Project. The Group was appointed by solar industry leader, Topsun Co. Ltd. With limited experience in marine operations, Topsun Co. Ltd., Swiss Re and other reinsurers contracted LOC Korea for the project as a recognised leading MWS service provider for subsea cable installation and marine operations. The scope of work requires the provision of MWS services for the 154 kilovolt XLPE 3C 800sq. mm subsea cable transhipment, laying and shore pull operations. The project entails the installation of one 400MW Photovoltaic panel systems, that will be fitted on evaporated salt ponds on the islands of Shinan Province, Jeollanam-Do, and lined to the mainland Korea substation via the two subsea cables. The subsea installation is expected to commence in Q4 2020, with plans of competition in Q1 2021. Zhoongkeun Kim, Country Manager at LOC Korea, commented: “This contract confirms LOC Korea’s recognised reputation as a leading provider of MWS services for subsea cable installation, following a good year of similar contract wins, including with LS Cables & Systems. This also marks an exciting step for the wider LOC Renewables team as it continues to develop a presence and broaden its technical expertise in the solar energy market, marking the support LOC offers in the fixed and floating solar arena.” Source: https://loc-group.com/Image source: Shutterstock – Industry Projects & Technology stock image Read more Subsea news here

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data