logo

Lock 10 Hydro Power Project

Sector: Road • Location: Kentucky, United States

Source: Lane Report

Project
Planned

Lock 10 Hydro Partners LLC plans to build a run-of-river hydroelectric plant on the Kentucky River, generating 3 megawatts of renewable energy for Madison County, expected to power 1,600 homes annually.

Status
Prospective
Sector
Road, Hydro, Power Generation (CCGT)
Location
Kentucky, United States of America
Updated
22 Jul 2026
Source
Lane Report

ConstructChat

Ask ConstructChat about Lock 10 Hydro Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lock 10 Hydro Power Project” is an infrastructure initiative in the Road sector, located in Kentucky, United States. Taiyo aggregates data on it from Lane Report.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Lock 10 Hydro Partners LLC plans to build a run-of-river hydroelectric plant on the Kentucky River, generating 3 megawatts of renewable energy for Madison County, expected to power 1,600 homes annually.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Kentucky

Source

Source

Lane Report

URL

More Details

Record type

Project

Sector

Road, Hydro, Power Generation (CCGT)

Article published date

2025-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project