logo

Lock and Dam 22 Fish Passage Improvements

Sector: Hydro • Location: Saverton, Missouri, United States of America

Source: Dodge USA

Project
Bid Results

The U.S. Army Corps of Engineers (USACE), Rock Island District, has a requirement for a Fish Passage at Lock and Dam 22 at Mile 301.2 Saverton, MO Ralls County, MO and Pike County, IL for work to include but not limited to: demolition; construct a rock ramp fishway; concrete bridge; install ice and debris boom; sheet piling work, concrete work; earthwork; stone and boulder placement; access ramp w

Status
Closed
Sector
Hydro, Cement, Waste Processing and Treatment, Commercial, Bridge, Water Supply and Storage, Power Generation (CCGT), Raw Materials
Location
Saverton, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Lock and Dam 22 Fish Passage Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lock and Dam 22 Fish Passage Improvements” is an infrastructure initiative in the Hydro sector, located in Saverton, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The U.S. Army Corps of Engineers (USACE), Rock Island District, has a requirement for a Fish Passage at Lock and Dam 22 at Mile 301.2 Saverton, MO Ralls County, MO and Pike County, IL for work to include but not limited to: demolition; construct a rock ramp fishway; concrete bridge; install ice and debris boom; sheet piling work, concrete work; earthwork; stone and boulder placement; access ramp work; building (with architectural materials) and deck erection; electrical work, design network a...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Saverton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Hydro, Cement, Waste Processing and Treatment, Commercial, Bridge, Water Supply and Storage, Power Generation (CCGT), Raw Materials

Article published date

2024-08-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project