LOCUST CONTROL
Closed · Algeria
Source: World Bank Group
The project will consist of the following components to be implemented over a two year period: (i) three locust control campaigns over an estimated area of 6.5 million hectares; (ii) the strengthening of the national desert locust control capabilities by reinforcing the existing stock of vehicles and equipment to be used for ground control; (iii) reinforcing comprehensive surveillance and warning
- Status
- Closed
- Sector
- Automotive, Raw Materials, Government
- Location
- Algeria
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about LOCUST CONTROL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will consist of the following components to be implemented over a two year period: (i) three locust control campaigns over an estimated area of 6.5 million hectares; (ii) the strengthening of the national desert locust control capabilities by reinforcing the existing stock of vehicles and equipment to be used for ground control; (iii) reinforcing comprehensive surveillance and warning systems; and (iv) technical assistance to the National Institute for Plant Protection (INPV) and the Central Command Post (PCC) in the form of short missions of selected specialists in pesticide handling and application and in prospection methods. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Algeria |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Automotive, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in Algeria
- Biskra CombinedCycle Power Plant
- Metro of Algiers
- Enterprise Publique Economique de Contrôle Technique Automobile (COTA)
- SCIENCES EN MEDITERRANEE
- MEDPAN - Réseau de gestionnaires d'aires marines protégées de Méditerranée
- Mostaganem Tramway, Algeria
- IRRIG. ENGINEERING L
- Fiat-Stellantis Automotive Plant Expansion
