logo
ProjectClosed

Lodge Evanston / ISA - Interface Studio Architects

One of 10,000+ projects Taiyo tracks in United States.

Source: ArchDaily

Retaining History For A New Present - Originally constructed at the corner of Church Street and Oak Avenue in 1910 for a largely Swedish immigrant community, the existing building on the site was used by the Soujorner Covenant Church for over a hundred years. Like many urban congregations, it had dwindled to just 25 people by 2018, and the church decided to sell the property. Composed of common br

Status
Closed
Sector
Road, Education, Residential, Commercial
Location
United States of America
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about Lodge Evanston / ISA - Interface Studio Architects

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Lodge Evanston / ISA - Interface Studio Architects” is an infrastructure initiative in the Road sector, located in United States. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Retaining History For A New Present - Originally constructed at the corner of Church Street and Oak Avenue in 1910 for a largely Swedish immigrant community, the existing building on the site was used by the Soujorner Covenant Church for over a hundred years. Like many urban congregations, it had dwindled to just 25 people by 2018, and the church decided to sell the property. Composed of common brick with little ornamentation, the original facade featured arched windows and a distinctive pointed opening above the main doors. A 1950 renovation – whose changes were still intact at the time the property was acquired – had added painted decorative window trim, faux pilasters, and a half-moon transom at the main entry doors, covering up the building's original historic design. The design team worked with the historic commission and the found imagery to strip back added elements, restoring original window openings and sandblasting the brick surface back to its original unpainted condition.Creating Variety - Retaining the existing church structure and adding a compact addition maximized unit count as well as perimeter wall area for light, air, and views. The resulting unit mix of flats and unique bi-level and tri-level typologies provided unexpected layouts and special interior experiences for residents, creating a defining identity for the project, unlike the typical sameness promoted in the new construction marketplace. The building is a model for inclusionary housing, with three affordable units, including one 2-bedroom and two 1-bedroom. Three ground-floor units provide ADA-accessible flats entered directly off Oak Avenue, including one Type A unit and two adaptable units.Text description provided by the architects.Responsive Infill - Lodge Evanston revived an abandoned church structure in downtown Evanston, Illinois, transforming it with a new addition into 30 apartments a few blocks from Northwestern University as well as a transit line connecting to downtown Chicago. Straddling the boundary between low-density residential urban fabric to the west and a large-scale commercial and institutional mixed-use zone to the east, the project preserved a key piece of Evanston's historic fabric while adding housing density with a diverse mix of unit types on an underutilized and transit-adjacent lot.Saved From Demo - The project developer, a housing specialist based in nearby Chicago and well-versed in adaptive reuse, initially assumed the church structure was too difficult to reuse due to the scale and configuration of its double-height sanctuary and split-level entry. The design team initially studied options for demolishing the church and infilling the site to zoning code maximums with a double-loaded corridor building, but the narrow width and required setbacks on the L-shaped site created an inefficient envelope for housing.

Location

Country

United States of America (USA)

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Road, Education, Residential, Commercial

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project