Loeriesfontein 2 Wind Farm
Sector: Solar • Location: South Africa
Source: World Bank Group
The 140MW Loeriesfontein 2 Wind Farm reached financial closure in February 2015, as Mainstream Renewable Power or the sponsor of the project announced that it had closed financing for its three-wind-farm-portfolio, including Loeriesfontein 2 Wind Farm. It was a part of Window 3 of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) by Department of Energy (DoE). The DoE
- Status
- Prospective
- Sector
- Solar, Biomass, Wind, Raw Materials, Power Transmission, Government, Manufacturing (Industrial), Power Generation (CCGT), Commercial
- Location
- South Africa
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Loeriesfontein 2 Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 140MW Loeriesfontein 2 Wind Farm reached financial closure in February 2015, as Mainstream Renewable Power or the sponsor of the project announced that it had closed financing for its three-wind-farm-portfolio, including Loeriesfontein 2 Wind Farm. It was a part of Window 3 of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) by Department of Energy (DoE). The DoE selected six solar photovoltaic, seven wind, two concentrated solar power, one landfill gas and one biomass project as preferred bidders in October 2013 for the third round of its REIPPP and the sponsors for each project were scheduled to simultaneously sign power purchase agreements with state utility Eskom and reach financial close on 30 July. The financial closure was delayed mainly due to the insufficient transmission infrastructure for the generation facilities. On July 22, DoE confirmed that the 17 projects involved in the third round of REIPPP would not reach financial close on 30 July 2014, as planned. Unlike in previous rounds of the REIPPP, where the signing of project documents and financial close happened simultaneously, none of the Window 3 deals was expected to close before January 2015 at the earliest, according to sources working on the transactions. This BOO project worth of US$281 million would entail the development of wind farm located in Namakwa, Northern Cape, composed of 61 turbines of power 2,300 kW. The project company was South Africa Mainstream Renewable Power Loeriesfontein 2 Pty Ltd and it was led by Lekela Power(40%), a joint venture between Actis, and Mainstream Renewable Power. Other members include Thebe Investment Corporation (10%); The IDEAS Managed Fund (Old Mutual Life Assurance Company South Africa) (25%); Futuregrowth Asset Management(Old Mutual Life Assurance Company South Africa) (5%); Genesis Eco-Energy in partnership with Lereko Metier Sustainable Capital(15%); and the Loeriesfontein Renewable Energy Trust(5%), which was established with the objective of carrying out public benefit activities to assist the local community through economic development. Lekela Power was a pan-African renewable energy platform which aimed to provide 1,000MW of wind and solar power by 2018. It was a 60:40 joint venture between Actis, the global pan-emerging market private equity firm, and Mainstream Renewable Power, the global wind and solar company. Debt financing was provided by ABSA Bank Limited (70%), Development Bank of Southern Africa, and EKF (30%). In addition to the Loeriesfontein 2 Wind Farm, Mainstream is currently constructing other two wind farms in the Northern Cape, totalling 360MW and representing an investment of approximately $722 million (ZAR9 billion). http://www.nersa.org.za/Admin/Document/Editor/file/Consultations/Electricity/Presentations/South%20Africa%20Mainstream%20Renewable%20Power%20Loeriesfontein%202%20(Pty)%20LTD.pdf Funding information should be updated in the future. |
Original sector | Energy |
Budget |
Location
Country | South Africa |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Solar, Biomass, Wind, Raw Materials, Power Transmission, Government, Manufacturing (Industrial), Power Generation (CCGT), Commercial |
Article published date | 2024-09-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
