Loeriesfontein 2 Wind Farm
Sector: Biomass • Location: South Africa
Source: World Bank Group
The 140MW Loeriesfontein 2 Wind Farm reached financial closure in February 2015, as Mainstream Renewable Power or the sponsor of the project announced that it had closed financing for its three-wind-farm-portfolio, including Loeriesfontein 2 Wind Farm. It was a part of Window 3 of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) by Department of Energy (DoE). The DoE
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The 140MW Loeriesfontein 2 Wind Farm reached financial closure in February 2015, as Mainstream Renewable Power or the sponsor of the project announced that it had closed financing for its three-wind-farm-portfolio, including Loeriesfontein 2 Wind Farm. It was a part of Window 3 of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) by Department of Energy (DoE). The DoE selected six solar photovoltaic, seven wind, two concentrated solar power, one landfill gas and one biomass project as preferred bidders in October 2013 for the third round of its REIPPP and the sponsors for each project were scheduled to simultaneously sign power purchase agreements with state utility Eskom and reach financial close on 30 July. The financial closure was delayed mainly due to the insufficient transmission infrastructure for the generation facilities. On July 22, DoE confirmed that the 17 projects involved in the third round of REIPPP would not reach financial close on 30 July 2014, as planned. Unlike in previous rounds of the REIPPP, where the signing of project documents and financial close happened simultaneously, none of the Window 3 deals was expected to close before January 2015 at the earliest, according to sources working on the transactions. This BOO project worth of US$281 million would entail the development of wind farm located in Namakwa, Northern Cape, composed of 61 turbines of power 2,300 kW. The project company was South Africa Mainstream Renewable Power Loeriesfontein 2 Pty Ltd and it was led by Lekela Power(40%), a joint venture between Actis, and Mainstream Renewable Power. Other members include Thebe Investment Corporation (10%); The IDEAS Managed Fund (Old Mutual Life Assurance Company South Africa) (25%); Futuregrowth Asset Management(Old Mutual Life Assurance Company South Africa) (5%); Genesis Eco-Energy in partnership with Lereko Metier Sustainable Capital(15%); and the Loeriesfontein Renewable Energy Trust(5%), which was established with the objective of carrying out public benefit activities to assist the local community through economic development. Lekela Power was a pan-African renewable energy platform which aimed to provide 1,000MW of wind and solar power by 2018. It was a 60:40 joint venture between Actis, the global pan-emerging market private equity firm, and Mainstream Renewable Power, the global wind and solar company. Debt financing was provided by ABSA Bank Limited (70%), Development Bank of Southern Africa, and EKF (30%). In addition to the Loeriesfontein 2 Wind Farm, Mainstream is currently constructing other two wind farms in the Northern Cape, totalling 360MW and representing an investment of approximately $722 million (ZAR9 billion). http://www.nersa.org.za/Admin/Document/Editor/file/Consultations/Electricity/Presentations/South%20Africa%20Mainstream%20Renewable%20Power%20Loeriesfontein%202%20(Pty)%20LTD.pdf Funding information should be updated in the future. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
