Log Cabin Wastewater Preliminary Treatment Rehabilitation
Sector: Water Supply and Storage • Location: Log Cabin, Texas, United States of America
Source: Dodge
The rehabilitation of the wastewater preliminary treatment will include the construction of a new bar screen, rotating industrial fine screen to help remove wastewater components (preliminary treatment). A settling basin is also planned for the proposed project. Also, two new pumps will be installed in the flow equalization tank to pump wastewater from the screens up to the surface level of the fa
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Manufacturing (Industrial), Commercial
- Location
- Log Cabin, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Log Cabin Wastewater Preliminary Treatment Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The rehabilitation of the wastewater preliminary treatment will include the construction of a new bar screen, rotating industrial fine screen to help remove wastewater components (preliminary treatment). A settling basin is also planned for the proposed project. Also, two new pumps will be installed in the flow equalization tank to pump wastewater from the screens up to the surface level of the facility. New yard piping is proposed from the wastewater preliminary treatment, wastewater primary... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Log Cabin |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
