LOI/AE: Bridge Deck Replacement
Closed · Ohio · Last reported Oct 2024
Source: Dodge USA
Qualified consultant for engineering services (Phase I Site Inspection/Engineering Report/Design/Plan Preparation; Phase II Engineering Support During Construction) for the following: Bridge Deck Replacement Project No. 71-24-15 Deck Replacement of Ohio Turnpike Mainline Bridge over Carson-Salt Springs Road at Milepost 213.6; Deck Replacement of Lyntz-Townline Road (CR 89) at Milepost 214.5 over t
- Status
- Closed
- Sector
- Commercial, Road, Bridge
- Location
- Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about LOI/AE: Bridge Deck Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Qualified consultant for engineering services (Phase I Site Inspection/Engineering Report/Design/Plan Preparation; Phase II Engineering Support During Construction) for the following: Bridge Deck Replacement Project No. 71-24-15 Deck Replacement of Ohio Turnpike Mainline Bridge over Carson-Salt Springs Road at Milepost 213.6; Deck Replacement of Lyntz-Townline Road (CR 89) at Milepost 214.5 over the Ohio Turnpike Mainline; Deck Replacement of OT Ramp Bridge at TP 216 at Milepost 216.4 over th... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Bridge |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
