LOI/CM/GC: Reconstruction Piedmont & N Railway Mainline
Sector: Power Transmission • Location: Gastonia, North Carolina, United States of America
Source: Dodge USA
Construction Manager / General Contractor services for I-85 in Gaston County and includes replacing several railway and roadway bridges, the demolition and removal of existing bridges, secondary roadway work and utility relocation. Project include 1) Temporary bridge for Bridge No. 350129 on Piedmont & Northern (P&N) (MP SFC 21.55) west of East Ozark Avenue 2) Bridge No. 350129 on P&N (MP SFC 21.5
- Status
- Closed
- Sector
- Power Transmission, Bridge, Mass Transit, Rail, Power Generation (CCGT), Commercial
- Location
- Gastonia, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about LOI/CM/GC: Reconstruction Piedmont & N Railway Mainline
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction Manager / General Contractor services for I-85 in Gaston County and includes replacing several railway and roadway bridges, the demolition and removal of existing bridges, secondary roadway work and utility relocation. Project include 1) Temporary bridge for Bridge No. 350129 on Piedmont & Northern (P&N) (MP SFC 21.55) west of East Ozark Avenue 2) Bridge No. 350129 on P&N (MP SFC 21.55) west of East Ozark Avenue 3) Bridge No. 350132 on Norfolk Southern (NS) (MP Mainline 397.73) e... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Gastonia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Bridge, Mass Transit, Rail, Power Generation (CCGT), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
