Lombard Street Vision Zero Project
Sector: Automotive • Location: San Francisco, California, United States of America
Source: SFMTA Projects
Lombard Street Vision Zero Project Share this: Facebook Twitter LinkedIn Project Introduction Lombard Street is a high-injury corridor; several treatments are proposed to improve safety along the corridor between Van Ness and Doyle Drive. The treatments include transit and pedestrian bulbs, high-visibility crosswalks, leading pedestrian intervals, advanced limit lines and intersection daylighting.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Lombard Street Vision Zero Project Share this: Facebook Twitter LinkedIn Project Introduction Lombard Street is a high-injury corridor; several treatments are proposed to improve safety along the corridor between Van Ness and Doyle Drive. The treatments include transit and pedestrian bulbs, high-visibility crosswalks, leading pedestrian intervals, advanced limit lines and intersection daylighting. Combined, these treatments can effectively reduce the high collision-rates for pedestrians and vehicles on Lombard Street. Near-term safety improvements, including signal timing adjustments, intersection daylighting and enhanced crosswalk and intersection striping were installed during the summer and fall of 2016 while the team continued to coordinate among the various city agencies to finalize detailed design and construction plans. Construction of the pedestrian and transit bulbs (sidewalk extensions) has now begun. For more information regarding construction, please visit SFPW’s website . Project Timeline Community outreach and planning phase Community outreach and planning phase Completed Engineering public hearing Engineering public hearing Completed SFMTA Board of Director approvals SFMTA Board of Director approvals Completed Detailed Design Detailed Design Completed Construction Construction Pending Project Status Legislated Implementation / Construction Completed Bus Routes and Rail Lines 28 19th Avenue 43 Masonic 91 3rd Street/19th Avenue Owl Neighborhoods Presidio Marina Project Details, History or Features Full intersection details and frequently asked questions can be found in the Documents & Reports tab. This project is being coordinated with SFPUC utility upgrades along with Caltrans repaving. The Project requires review for both the California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA). For CEQA, the San Francisco Planning Department (SF Planning) is the lead agency; as such, staff from the Planning Department are reviewing the project details to determine if the project, as proposed, is within the scope of the analysis completed for the Transportation Effectiveness Project Environmental Impact Report (TEP EIR). To access the final TEP EIR please visit the SF Planning's webpage for more information. Contact Information Darcie Alaba darcie.alaba@sfmta.com |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
