logo

Lome Container Terminal

Sector: Automotive • Location: Togo

Source: World Bank Group

Project
Active

The Lomé Container Terminal (LCT) was the third container terminal in the port of Lomé on the Gulf of Guinea, a major gateway into West and Central Africa. The container terminal was to add to the existing 220.000 TEU of the other two terminals.

The LCT was owned by a special purpose vehicle (Global Terminal Limited - GLT)) created by Mediterrenean Shipping Company (MSC), the world's second larg

Status
Prospective
Sector
Automotive, Water Supply and Storage, Government, Seaport, Commercial
Location
Togo
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Lome Container Terminal

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Lome Container Terminal” is an infrastructure initiative in the Automotive sector, located in Togo. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Lomé Container Terminal (LCT) was the third container terminal in the port of Lomé on the Gulf of Guinea, a major gateway into West and Central Africa. The container terminal was to add to the existing 220.000 TEU of the other two terminals. The LCT was owned by a special purpose vehicle (Global Terminal Limited - GLT)) created by Mediterrenean Shipping Company (MSC), the world's second largest shipping line and LCT's anchor customer, and Getma Group of France. MSC was also to enter into a terminal service agreement committing to channel most of its WCA cargo through the Terminal. The terminal's construction began in April 2011 by Société d’Entreprise de Manutentions Maritimes (SE2M-TOGO), part of the French firm Bolloré. The 35-year concession, with an optional 10 year extension, was awarded by the Government of Togo to Lomé Container Terminal, already in 2008. The concession was for the development, construction, and operation of a greenfield container terminal (a third quay), bringing the estimated handling capacity up to 1.5 million TEU per annum. 2010-2011 saw a total handling of 320,000 TEU. The total project represented an investment of an estimated $487 million (€350 million) at the time. Total financing was some $189 million dollar: In 2011, the African Development Bank approved a loan of $85 million (€60 million) for the construction of a new container terminal adjacent to the existing facility. Other financiers included China Development Bank, DEG (KfW Group), FMO, Proparco, and the IFC, the latter for up to $104 million (€75 million). By the end of 2013, the third berth of 450m and a water depth of 15m was operationalized. https://ijglobal.com/articles/78380/-350m-african-container-terminal-ready-to-close http://ifcextapps.ifc.org/ifcext/spiwebsite1.nsf/78e3b305216fcdba85257a8b0075079d/52d84e09b7a51fc3852577cf0050d4e1?opendocument

Original sector

Transport

Procurement method

Budget

Location

Country

Togo

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Automotive, Water Supply and Storage, Government, Seaport, Commercial

Article published date

2024-05-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project