logo

London Underground Upgrade, United Kingdom

Sector: Airport • Location: United Kingdom

Source: Bechtel

Project
Close

London Underground Upgrade,London Underground Upgrade A Bechtel consortium worked to upgrade the Jubilee, Northern, and Piccadilly lines of the tube, London's historic underground subway system, which was the first in the world and built over 150 years ago. The three lines accounted for nearly 40 percent of the Underground's total length. The Bechtel consortium worked in partnership with London Un

Project Information FAQ

Project Information

5 Q
The project “London Underground Upgrade, United Kingdom” is an infrastructure initiative in the Airport sector, located in United Kingdom. Taiyo aggregates data on it from Bechtel.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

London Underground Upgrade,London Underground Upgrade A Bechtel consortium worked to upgrade the Jubilee, Northern, and Piccadilly lines of the tube, London's historic underground subway system, which was the first in the world and built over 150 years ago. The three lines accounted for nearly 40 percent of the Underground's total length. The Bechtel consortium worked in partnership with London Underground to design and build infrastructure including trains, signaling, tracks, bridges, drainage, escalators, and lifts. Fast Facts The modernization of the Jubilee, Northern, and Piccadilly lines included installing a new signaling system and updating or upgrading: 251 trains 100 stations 187 miles (about 300 kilometers) of track 2,395 bridges and other structures, 227 escalators 71 lifts  A new signaling system made perhaps the most dramatic difference—providing a better, safer service and a higher level of reliability. Image Library Extraordinary preparation and planning To keep the Underground running throughout the project, contractors and crews performed their work during a small window of opportunity when the trains stopped running—between 1am and 5 am —which required extraordinary preparation and planning.   The renovation and upgrade work on the three Underground lines set the stage for development and redevelopment, and created a rail connection to Terminal 5 at Heathrow Airport. The work was completed under budget and ahead of schedule.  Project funding Funding for the project was facilitated by Bechtel Enterprises, our financing and development arm, which helped Tube Lines arrange a financial package that involved 29 banks, then also assisted with a restructuring that converted the package to a successful bond issue.  

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data