logo

Lone Star Parkway Channel Stabilization

Sector: Water Supply and Storage • Location: Montgomery, Texas, United States of America

Source: Dodge USA

Project
Closed

This project along Town Creek at Lone Star Parkway, is 255 LF of creek channel. This 255 footlong project is an existing eroded channel with proposed revetment and erosion control measures, includes; 2,374 CY of channel excavation, 605 CY of embankment, 725 SY of cellulose fiber mulch seed, 1,662 CY of stone riprap, 20 LF of rock filter dam, 350 LF of silt fence and 4 construction exits.

Status
Closed
Sector
Water Supply and Storage, Hydro, Waste Processing and Treatment, Government, Road, Commercial
Location
Montgomery, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Lone Star Parkway Channel Stabilization

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lone Star Parkway Channel Stabilization” is an infrastructure initiative in the Water Supply and Storage sector, located in Montgomery, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project along Town Creek at Lone Star Parkway, is 255 LF of creek channel. This 255 footlong project is an existing eroded channel with proposed revetment and erosion control measures, includes; 2,374 CY of channel excavation, 605 CY of embankment, 725 SY of cellulose fiber mulch seed, 1,662 CY of stone riprap, 20 LF of rock filter dam, 350 LF of silt fence and 4 construction exits.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Montgomery

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Waste Processing and Treatment, Government, Road, Commercial

Article published date

2023-05-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project