Long Bridge Expansion Project
The owner, status and timeline of this project. A free account opens every field.
Source: The Richmonder
A $2.7 billion project to add two additional tracks to the existing two tracks on the Long Bridge over the Potomac River between D.C. and Virginia. The project includes seven bridges for passenger rail, freight rail, pedestrians, and bicyclists. Construction will reduce train service temporarily but will increase capacity upon completion.
- Status
- Prospective
- Sector
- Rail, Bridge, Government
- Location
- Washington D.C., Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- The Richmonder
ConstructChat
Ask ConstructChat about Long Bridge Expansion Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A $2.7 billion project to add two additional tracks to the existing two tracks on the Long Bridge over the Potomac River between D.C. and Virginia. The project includes seven bridges for passenger rail, freight rail, pedestrians, and bicyclists. Construction will reduce train service temporarily but will increase capacity upon completion. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Washington D.C. |
Source
Source | The Richmonder |
URL |
More Details
Record type | Project |
Sector | Rail, Bridge, Government |
Article published date | 2025-12-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
