Long-Duration Battery Storage Project
Planned · Queensland · Last reported Mar 2025
Source: Asian Power
Quinbrook Infrastructure Partners plans to build an advanced long-duration battery energy storage system (BESS) in collaboration with CATL. This project aims to create the world’s first genuine 8-hour battery storage system, significantly enhancing the current maximum 4-hour duration systems. The deployment will focus on over 3 gigawatts of capacity across various sites in Australia, starting at t
- Status
- Prospective
- Sector
- Power Generation (CCGT), Energy Storage
- Location
- Brisbane, Queensland, Australia
- Updated
- 22 Jul 2026
- Source
- Asian Power
ConstructChat
Ask ConstructChat about Long-Duration Battery Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Quinbrook Infrastructure Partners plans to build an advanced long-duration battery energy storage system (BESS) in collaboration with CATL. This project aims to create the world’s first genuine 8-hour battery storage system, significantly enhancing the current maximum 4-hour duration systems. The deployment will focus on over 3 gigawatts of capacity across various sites in Australia, starting at the Supernode site in Brisbane. |
Original sector | Energy |
Location
Country | Australia |
State | Queensland |
City | Brisbane |
Source
Source | Asian Power |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Energy Storage |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
