Long Road Culvert Replacement
Sector: Water Supply and Storage • Location: Plainfield Township, Pennsylvania, United States of America
Source: Dodge USA
Work to be performed under this contract shall include all labor, tools, equipment and materials necessary to construct the Long Road Culvert Replacement including removal and disposal of the existing culvert, selective tree clearing and grubbing, all excavations, stream diversion with pump bypass and cofferdam, and installation of a 8 wide x 6 high precast concrete box culvert system with precast
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Work to be performed under this contract shall include all labor, tools, equipment and materials necessary to construct the Long Road Culvert Replacement including removal and disposal of the existing culvert, selective tree clearing and grubbing, all excavations, stream diversion with pump bypass and cofferdam, and installation of a 8 wide x 6 high precast concrete box culvert system with precast wingwalls and constructed stream bed as well as restoration of the roadway, surface stabilizatio... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
