Longbrook/Yorktown Roads Rehabilitation
Sector: Water Supply and Storage • Location: Lorain, Ohio, United States of America
Source: Dodge
Longbrook/Yorktown Roads Rehabilitation. Construction Inspection and Construction Administration, and associated field testing services in the City of Lorain for removal and replacement of existing asphalt pavement roadway from edge of pavement to edge of pavement on Longbrook Road (LOR-MR0879-0.196) from Kolbe Road to Yorktown Road, and the removal and replacement of existing concrete roadway fro
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Road, Waste Processing and Treatment, Commercial, Power Transmission, Power Generation (CCGT)
- Location
- Lorain, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Longbrook/Yorktown Roads Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Longbrook/Yorktown Roads Rehabilitation. Construction Inspection and Construction Administration, and associated field testing services in the City of Lorain for removal and replacement of existing asphalt pavement roadway from edge of pavement to edge of pavement on Longbrook Road (LOR-MR0879-0.196) from Kolbe Road to Yorktown Road, and the removal and replacement of existing concrete roadway from curb to curb on Yorktown Road (LOR-MR-04319-0.000) from Longbrook Road to Oak Point Road by ins... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Lorain |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Road, Waste Processing and Treatment, Commercial, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
