logo

Longquanshan Waste-to-Energy plant

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

The project envisages a new 3,000-ton/day waste incineration power plant in the Longquanshan landfill in Hefei City. These include production areas (mainly garbage receiving and storage systems, mechanical grate-type waste incinerators (4 × 750 tons / day), condensing steam turbine generator sets, waste incineration systems, flue gas purification systems, slag removal, ash Systems, chemical water

Status
Prospective
Sector
Water Supply and Storage, Biomass, Chemical (Industrial), Power Generation (CCGT), Government, Warehouse, Oil and Gas, Wind, Manufacturing (Industrial), Waste Processing and Treatment, Commercial
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Longquanshan Waste-to-Energy plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Longquanshan Waste-to-Energy plant” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project envisages a new 3,000-ton/day waste incineration power plant in the Longquanshan landfill in Hefei City. These include production areas (mainly garbage receiving and storage systems, mechanical grate-type waste incinerators (4 × 750 tons / day), condensing steam turbine generator sets, waste incineration systems, flue gas purification systems, slag removal, ash Systems, chemical water treatment systems, electrical systems, control systems, leachate collection and treatment systems, etc.). Auxiliary production areas (mainly including logistics import weighing, hydraulic facilities, oil pumping houses and underground oil tanks, sewage treatment stations, leachate treatment stations, fly ash solidification workshops, fly ash and slag landfills, etc.). Total project cost is $ 204.55 million. The BOT concession has a duration of 30 years. Financial close took place on September 25, 2018. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=2fecaf11823b46a790cf655ddfe65ee3

Original sector

Municipal Solid Waste

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Biomass, Chemical (Industrial), Power Generation (CCGT), Government, Warehouse, Oil and Gas, Wind, Manufacturing (Industrial), Waste Processing and Treatment, Commercial

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project