Longspur Wind 200MW
Planning schematics · North Dakota · Last reported Sep 2025
Source: Dodge
Minnesota Power plans to construct a 200 MW wind project called Longspur Wind in North Dakota, consisting of 45 turbines. It's part of their 'EnergyForward' initiative to achieve 90% renewable energy by 2035. The project will utilize existing infrastructure and a 465-mile HVDC transmission line to deliver wind energy to northern Minnesota.
- Status
- Prospective
- Sector
- Power Transmission, Power Generation (CCGT), Commercial, Wind
- Location
- North Dakota, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Longspur Wind 200MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Minnesota Power plans to construct a 200 MW wind project called Longspur Wind in North Dakota, consisting of 45 turbines. It's part of their 'EnergyForward' initiative to achieve 90% renewable energy by 2035. The project will utilize existing infrastructure and a 465-mile HVDC transmission line to deliver wind energy to northern Minnesota. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Commercial, Wind |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
