logo
ProjectPlanned

Longspur Wind Farm

Planned · North Dakota · Last reported Aug 2025

Source: Wind Power Monthly

A 200MW wind farm planned by Minnesota Power in North Dakota, consisting of 45 turbines near the existing 500MW Bison Wind Energy Center. The project aims to utilize existing infrastructure and deliver power to northern Minnesota, supporting the utility's target of 80% renewable power supply by 2030.

Status
Prospective
Sector
Raw Materials, Power Generation (CCGT), Wind
Location
North Dakota, United States of America
Updated
22 Jul 2026
Source
Wind Power Monthly

ConstructChat

Ask ConstructChat about Longspur Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Longspur Wind Farm” is an infrastructure initiative in the Raw Materials sector, located in North Dakota, United States. Taiyo aggregates data on it from Wind Power Monthly.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 200MW wind farm planned by Minnesota Power in North Dakota, consisting of 45 turbines near the existing 500MW Bison Wind Energy Center. The project aims to utilize existing infrastructure and deliver power to northern Minnesota, supporting the utility's target of 80% renewable power supply by 2030.

Original sector

Energy

Location

Country

United States of America (USA)

State

North Dakota

Source

Source

Wind Power Monthly

URL

More Details

Record type

Project

Sector

Raw Materials, Power Generation (CCGT), Wind

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project