logo
ProjectPlanned

Longspur Wind Project

The owner, status and timeline of this project. A free account opens every field.

Source: St. Cloud Times

A 200-megawatt wind project consisting of 45 turbines planned by Minnesota Power in North Dakota's Morton and Mercer counties. The project will use an existing 465-mile transmission line to move power to northern Minnesota and is expected to begin construction in 2026, becoming operational in late 2027.

Status
Prospective
Sector
Power Generation (CCGT), Wind
Location
North Dakota, United States of America
Updated
22 Jul 2026
Source
St. Cloud Times

ConstructChat

Ask ConstructChat about Longspur Wind Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Longspur Wind Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in North Dakota, United States. Taiyo aggregates data on it from St. Cloud Times.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 200-megawatt wind project consisting of 45 turbines planned by Minnesota Power in North Dakota's Morton and Mercer counties. The project will use an existing 465-mile transmission line to move power to northern Minnesota and is expected to begin construction in 2026, becoming operational in late 2027.

Original sector

Energy

Location

Country

United States of America (USA)

State

North Dakota

Source

Source

St. Cloud Times

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Wind

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project