logo
ProjectPlanned

Loop 1604 and Blanco Road Diverging Diamond Interchange

Planned · Texas · Last reported Mar 2026

Source: KSAT

A major intersection along Loop 1604 on the North Side of San Antonio will be closed for construction to work on a diverging diamond interchange. This project aims to provide major traffic relief with a new diamond traffic pattern at Blanco Road over Loop 1604.

Status
Prospective
Sector
Road
Location
San Antonio, Texas, United States of America
Updated
22 Jul 2026
Source
KSAT

ConstructChat

Ask ConstructChat about Loop 1604 and Blanco Road Diverging Diamond Interchange

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Loop 1604 and Blanco Road Diverging Diamond Interchange” is an infrastructure initiative in the Road sector, located in San Antonio, Texas, United States. Taiyo aggregates data on it from KSAT.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A major intersection along Loop 1604 on the North Side of San Antonio will be closed for construction to work on a diverging diamond interchange. This project aims to provide major traffic relief with a new diamond traffic pattern at Blanco Road over Loop 1604.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Texas

City

San Antonio

Source

Source

KSAT

URL

More Details

Record type

Project

Sector

Road

Article published date

2026-03-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project