logo
ProjectUnder Construction

Loop 202 Santan Freeway Widening Project

The owner, status and timeline of this project. A free account opens every field.

Source: KTAR News 92.3 FM

The Loop 202 Santan Freeway widening project is an ongoing infrastructure project aimed at improving traffic flow on the freeway between Loop 101 and Val Vista Drive in Chandler and Gilbert, Arizona. The project spans 8 miles and includes adding lanes, widening bridges, and reconstructing interchanges. It started in August 2024 and is expected to take over two years to complete. The scheduled 60-d

Status
Under Construction
Sector
Road, Government
Location
Chandler, Arizona, United States of America
Updated
22 Jul 2026
Source
KTAR News 92.3 FM

ConstructChat

Ask ConstructChat about Loop 202 Santan Freeway Widening Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Loop 202 Santan Freeway Widening Project” is an infrastructure initiative in the Road sector, located in Chandler, Arizona, United States. Taiyo aggregates data on it from KTAR News 92.3 FM.

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Loop 202 Santan Freeway widening project is an ongoing infrastructure project aimed at improving traffic flow on the freeway between Loop 101 and Val Vista Drive in Chandler and Gilbert, Arizona. The project spans 8 miles and includes adding lanes, widening bridges, and reconstructing interchanges. It started in August 2024 and is expected to take over two years to complete. The scheduled 60-day closure of the eastbound Loop 202 Santan Freeway off-ramp at Alma School Road in Chandler, part of this project, has been postponed and will be rescheduled.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Chandler

Source

Source

KTAR News 92.3 FM

URL

More Details

Record type

Project

Sector

Road, Government

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project