logo

Loop 202 South Mountain Freeway

Sector: Bridge • Location: Arizona, United States of America

Source: Federal Highway Administration (FHWA)

Project
Close

The Loop 202 freeway, also known as the South Mountain Freeway, is a 22-mile, 8-lane freeway that will complete the Loop 202 and Loop 101 freeway system in the southwestern quadrant of the Phoenix metropolitan area. Starting near Chandler, the freeway will run west along Pecos Road and then turn north between 55th and

Project Information FAQ

Project Information

5 Q
The project “Loop 202 South Mountain Freeway” is an infrastructure initiative in the Bridge sector, located in Arizona, United States of America. Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Loop 202 freeway, also known as the South Mountain Freeway, is a 22-mile, 8-lane freeway that will complete the Loop 202 and Loop 101 freeway system in the southwestern quadrant of the Phoenix metropolitan area. Starting near Chandler, the freeway will run west along Pecos Road and then turn north between 55th and 63rd Avenues, connecting with Interstate 10 on each end. The project has been included in regional plans since 1985. The freeway provides three general-purpose lanes and one HOV lane in each direction with direct connector ramps to and from I-10 at its eastern and western termini. The project includes over 50 overpasses carrying local streets and arterials, as well as a bridge over the Salt River Bridge that will extend for nearly 3,000 feet. The freeway will have thirteen interchanges spaced at approximately one-mile intervals. The project has been procured as a P3 where the selected design-build team will also maintain the roadway under a 30-year agreement.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data