logo
ProjectUnder Construction

Loop 202 Widening Project

The status, timeline and source of this project. A free account opens every field.

Source: Daily Independent

The Loop 202 widening project involves the reconstruction of the eastbound off-ramp at Gilbert Road, which is scheduled to close for about 60 days. This project aims to add lanes and improve interchanges along Loop 202 between Loop 101 and Val Vista Drive.

Status
Under Construction
Sector
Road
Location
Phoenix, Arizona, United States of America
Updated
22 Jul 2026
Source
Daily Independent

ConstructChat

Ask ConstructChat about Loop 202 Widening Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Loop 202 Widening Project” is an infrastructure initiative in the Road sector, located in Phoenix, Arizona, United States. Taiyo aggregates data on it from Daily Independent.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Loop 202 widening project involves the reconstruction of the eastbound off-ramp at Gilbert Road, which is scheduled to close for about 60 days. This project aims to add lanes and improve interchanges along Loop 202 between Loop 101 and Val Vista Drive.

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Phoenix

Source

Source

Daily Independent

URL

More Details

Record type

Project

Sector

Road

Article published date

2025-01-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project