Loop 360 at Courtyard Drive/RM 2222 project
Sector: Mass Transit • Location: Austin, Texas, USA
Source: Community Impact | News
This project is part of TxDOT's projects along 14 miles of Loop 360 in West Austin, part of the Texas Clear Lanes congestion relief initiative. It will remove the traffic signal from Loop 360 main lanes at Courtyard Drive, construct an overpass, reconfigure RM 2222 at Loop 360 to a diverging diamond interchange, and add shared-use paths and sidewalks.
- Status
- Under Construction
- Sector
- Mass Transit, Road
- Location
- Austin, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Community Impact | News
ConstructChat
Ask ConstructChat about Loop 360 at Courtyard Drive/RM 2222 project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is part of TxDOT's projects along 14 miles of Loop 360 in West Austin, part of the Texas Clear Lanes congestion relief initiative. It will remove the traffic signal from Loop 360 main lanes at Courtyard Drive, construct an overpass, reconfigure RM 2222 at Loop 360 to a diverging diamond interchange, and add shared-use paths and sidewalks. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Austin |
Source
Source | Community Impact | News |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Road |
Article published date | 2026-05-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
