Loop 9 - Segment A: US 67 to IH 35E - Dallas/Ellis Counties
Sector: Road • Location: United States of America (USA)
Source: Texas Department of Transportation (TxDOT)
The proposed Loop 9 project includes construction of a six-lane new location frontage road system between US 67 and IH 35E through Dallas and Ellis counties, Texas. The approximately 9.4-miles system would pass through the communities of Cedar Hill, Midlothian, Ovilla, Glenn Heights, and Red Oak. The proposed project right of way would include a median that would accommodate future construction of
- Sector
- Road, Government, Manufacturing (Industrial), Forest Products and Packaging
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Texas Department of Transportation (TxDOT)
ConstructChat
Ask ConstructChat about Loop 9 - Segment A: US 67 to IH 35E - Dallas/Ellis Counties
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed Loop 9 project includes construction of a six-lane new location frontage road system between US 67 and IH 35E through Dallas and Ellis counties, Texas. The approximately 9.4-miles system would pass through the communities of Cedar Hill, Midlothian, Ovilla, Glenn Heights, and Red Oak. The proposed project right of way would include a median that would accommodate future construction of an ultimate access-controlled mainlane facility. Construction of the ultimate access-controlled mainlane roadway would be based on projected traffic and funding and would require additional environmental analysis prior to construction. The new location Loop 9 frontage road system would include an eastbound and westbound frontage road, each consisting of three 12-foot lanes, an eight-foot inside shoulder, and an eight-foot outside shoulder for bicycle accommodations within the rural section of the proposed roadway. The proposed project ROW would include a median that would accommodate the future construction of an ultimate access-controlled mainlane roadway. The proposed Loop 9 project would likely be constructed in three phases based on traffic needs and project funding. A logical sequence for construction of the new location frontage road system could be as follows: Phase 1 would construct a single two-lane, two-way frontage road, and would also acquire the proposed right of way to accommodate all six-lane frontage road system and the future ultimate access-controlled mainlane roadway. This phase would also include restriping of the US 67 intersection to accommodate the new Loop 9 frontage road turning movements. As traffic warrants and funding becomes available, Phase 2 would involve the construction of the three-lane frontage road in each direction, which would include the conversion of the two-way frontage road built in Phase 1 to a one-way operation, and the construction of grade separations at specific high-volume intersections. Phase 3 would involve the construction of the ultimate access-controlled mainlane facility in both directions. Construction of the ultimate access-controlled mainlane facility would be based on projected traffic and funding and would require additional environmental analysis prior to construction. |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Texas Department of Transportation (TxDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Government, Manufacturing (Industrial), Forest Products and Packaging |
Article published date | 2023-11-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America (USA)
- Auburn Avenue Historic and Cultural Information Project
- M.L. King Jr. Dr. Cycle Track
- A Bridge Home Projects
- Vanden Meadows
- Southeast Atlanta Green Infrastructure Initiative (SAGII) – Permeable Pavers
- Peachtree Creek – South Fork Green Infrastructure – Cheshire Bridge Road
- Hemphill Reservoir 1 Embankment 1
- Bolton Road & Phillip Lee Pump Stations Rehabilitation
