LOR-MR Sunnyside Road Widening and Reconstruction Phase 3
Sector: Water Supply and Storage • Location: Vermilion, Ohio, United States of America
Source: Dodge
This project involves the widening and reconstruction of Sunnyside Road (MR 4335) from 200 feet north of Shady Lake Drive to Liberty Avenue (U.S. 6) for approximately 0.4 miles. The work to be performed includes roadway widening and reconstruction, roadside drainage, grading, and signing and pavement marking. Construction Inspection, Construction Administration, and Testing services for widening a
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment
- Location
- Vermilion, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about LOR-MR Sunnyside Road Widening and Reconstruction Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves the widening and reconstruction of Sunnyside Road (MR 4335) from 200 feet north of Shady Lake Drive to Liberty Avenue (U.S. 6) for approximately 0.4 miles. The work to be performed includes roadway widening and reconstruction, roadside drainage, grading, and signing and pavement marking. Construction Inspection, Construction Administration, and Testing services for widening and reconstruction of approximately 0.4 miles of Sunnyside Road (LOR-MR4335- 2.37) from 200 north ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Vermilion |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
