Lorne Bridge Trail Realignment
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Infrastructure Canada
"This project will address safety concerns with the existing trail under Lorne Bridge adjacent to the Grand River. The project will realign the existing trail north of the embankment to move it away from the River to address the steep decline that currently causes many conflict points between pedestrians and cyclists. This project will fill the current trail and close it and formalize the trail th
- Status
- Closed
- Sector
- Road, Bridge, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Lorne Bridge Trail Realignment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | "This project will address safety concerns with the existing trail under Lorne Bridge adjacent to the Grand River. The project will realign the existing trail north of the embankment to move it away from the River to address the steep decline that currently causes many conflict points between pedestrians and cyclists. This project will fill the current trail and close it and formalize the trail that exists north that is at a level grade which needs to be set with asphalt to be formalized." |
Original sector | Active Transportation |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Government |
Article published date | 2025-07-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
