logo

Los Bronces Copper Mine, Chile

Sector: Bridge • Location: Chile

Source: Bechtel

Project
Close

Los Bronces Copper Mine,Sustainability and innovation to deliver a copper mine in extreme terrain Anglo American approved this spectacularly located and complex project, which traversed rugged mountainsides and extreme elevations, in order to double copper mining capacity in the Los Bronces district near Chile’s capital, Santiago. Thanks to a strong focus on using innovative solutions to protect

Project Information FAQ

Project Information

4 Q
The project “Los Bronces Copper Mine, Chile” is an infrastructure initiative in the Bridge sector, located in Chile. Taiyo aggregates data on it from Bechtel.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Los Bronces Copper Mine,Sustainability and innovation to deliver a copper mine in extreme terrain Anglo American approved this spectacularly located and complex project, which traversed rugged mountainsides and extreme elevations, in order to double copper mining capacity in the Los Bronces district near Chile’s capital, Santiago. Thanks to a strong focus on using innovative solutions to protect the environment, the various sites that comprise the concentrator expansion project had already begun to blend back into the dramatic landscape along the western face of the Chilean Andes within months of completion in late 2011.  Inside the project Various innovative and safe solutions were applied to carry out the excavations between the complicated geographical conditions and the rich natural environment nearby, which includes protected areas and glaciers. This coordinated work with our customer allowed us to establish a job site, Confluencia, on a tiny, steep pinnacle 10,500 feet (3,200 meters) above sea level, while also installing another one in a hillside far below. Caring for nearby water sources and controlling emissions, two of the environmental priorities we share with our customer, were included in the design, leading to the construction of a slurry pipeline that descends more than 8,700 feet (2,652 meters) over rough terrain, through hard-rock tunnels, and via bridges over deep canyons to transport ore between the sites. A reclamation system—crucial for water management and sustainability in this arid region—recovers and pumps slurry water to the concentrator for reuse. Throughout execution, the project encountered new risks, including snowfalls that could bury a truck, high winds, dramatic cliffs, and significant geotechnical challenges typical of mountain work. Furthermore, the project continued to advance despite the effects of the 8.8 magnitude earthquake that occurred on February 27, 2010, the sixth-largest ever recorded. Image gallery Logistics for a remarkable challenge Along with the aforementioned challenges, the great teamwork between Anglo American and Bechtel also helped overcome another challenge: the Las Tórtolas flotation plant was built on a former military target range encumbered with unexploded ordnance that required a thorough sweep before work could begin. Remote locations and weather conditions required provisioning our team members with shelter, food, and other necessities that had to be hauled up mountain roads, where snow could pile up to 13 feet (4 meters) high. As a result, the winter emergency committee monitored these roads 24 hours a day for avalanches and other risks. As an extra precaution, truck drivers routinely drove practice runs without their loads prior to delivery. Safety first Altitude sickness, extreme weather, avalanches, and rough terrain pose constant risks for workers at high-altitude sites such as Los Bronces. In keeping with the unwavering commitment to health and safety instilled in both Anglo America and Bechtel, all workers had to pass strict medical exams before they could start work. Thanks to the team's steadfast commitment, in 2012, the Chilean Chamber of Construction (Cámara Chilena de la Construcción) awarded Los Bronces a safety recognition for achieving 4 consecutive years without accidents.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data