Los Patios - Guasca - El Salitre - Briceno Toll Road
Sector: Government • Location: Colombia
Source: World Bank Group
The project, which was granted to Consorcio La Calera in Febraury 1994, included the rehabilitation and operation of a 53 km toll road. The construction works have already been finalized. Cromas S.A. and Incoequipos hold 30% of the consortium shares, Corp. Financiera de Desarrollo holds 25%, and Consultoria Colombiana holds 15%. The contract was granted for 166 months (13 years and 10 months).
T
- Status
- Closed
- Sector
- Government, Road
- Location
- Colombia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Los Patios - Guasca - El Salitre - Briceno Toll Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Concluded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project, which was granted to Consorcio La Calera in Febraury 1994, included the rehabilitation and operation of a 53 km toll road. The construction works have already been finalized. Cromas S.A. and Incoequipos hold 30% of the consortium shares, Corp. Financiera de Desarrollo holds 25%, and Consultoria Colombiana holds 15%. The contract was granted for 166 months (13 years and 10 months). The contract included the following segments: El Salitre-Sopó -Briceño (14,5 Km) and Los Patios - La Calera - Guasca (35,5 Km) In November 2005, the Instituto Nacional de Concesiones (INCO - Colombia's National Concessions Institute) anounced that it would renegotiate eight highway contracts. These contracts were costing the Government US$131 million (300,000 million pesos) each year in minimum revenue guarantees. Included in those is the contract for the Los Patios - Guasca - El Salitre - Briceno Toll Road concession. Conversations for the renegotiation of this contract had started at the time of the anouncement. According to INCO, the project concluded in July 2008. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Colombia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Government, Road |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project