Lot 1 Transmission Line in Espírito Santo, Minas Gerais, Paraná, Santa Catarina and São Paulo States
Sector: Power Transmission • Location: Brazil
Source: World Bank Group
"This project entails the construction of a 780 km electricity transmission line spanning the Brazilian states of Espírito Santo, Minas Gerais, Paraná, Santa Catarina, and São Paulo. The initiative also includes building the 525 kV Curitiba Oeste and Abdon Batista 2 substations, as well as extending the 230/138 kV Mascarenhas and 230 kV Aimorés substations. The project aims to strengthen the elect
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | "This project entails the construction of a 780 km electricity transmission line spanning the Brazilian states of Espírito Santo, Minas Gerais, Paraná, Santa Catarina, and São Paulo. The initiative also includes building the 525 kV Curitiba Oeste and Abdon Batista 2 substations, as well as extending the 230/138 kV Mascarenhas and 230 kV Aimorés substations. The project aims to strengthen the electrical infrastructure in Paraná and Santa Catarina, while also serving Espírito Santo, the eastern region, the Triângulo Mineiro area, and Alto Paranaíba in Minas Gerais. Approximately 5,866 direct jobs are expected to be generated, with a 60-month timeline for completion. The sponsor, French company ENGIE, secured a 30-year concession for the project through the Engie Brasil Transmissão Consortium, comprising Engie Transmissão de Energia Participações II SA (99.9%) and Engie Brasil Energia (0.01%). The consortium's winning bid of $46.2 million (R$252.4 million) represented a 48.14% discount from the maximum Annual Permitted Revenue (RAP) of $89.1 million (R$486.4 million) set by the regulatory agency. The total project cost is estimated at $550 million (R$3 billion), with a financial close date of September 27, 2024." https://www.gov.br/aneel/pt-br/assuntos/noticias/2024/consorcio-engie-brasil-transmissao-vence-lote-1-do-leilao-de-transmissao-no-2-2024 ; https://en.newsroom.engie.com/news/engie-wins-a-new-concession-to-build-and-operate-around-1000-km-of-transmission-lines-in-brazil-1165e-314df.html ; https://megawhat.energy/transmissao/engie-leva-lote-1-no-leilao-de-transmissao-com-investimentos-em-r-29-bi/ ; https://www.webdisclosure.com/press-release/engie-remporte-une-nouvelle-concession-pour-la-construction-et-lexploitation-denviron-1000-km-de-lignes-de-transmission-au-bresil-N3INB0BgcfM ; https://www.riotimesonline.com/brazilian-energy-auction-engie-taesa-and-cox-win-with-steep-discounts |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |