logo

Lot 1 Transmission Line in Espírito Santo, Minas Gerais, Paraná, Santa Catarina and São Paulo States

Sector: Power Transmission • Location: Brazil

Source: World Bank Group

Project
Active

"This project entails the construction of a 780 km electricity transmission line spanning the Brazilian states of Espírito Santo, Minas Gerais, Paraná, Santa Catarina, and São Paulo. The initiative also includes building the 525 kV Curitiba Oeste and Abdon Batista 2 substations, as well as extending the 230/138 kV Mascarenhas and 230 kV Aimorés substations. The project aims to strengthen the elect

Project Information FAQ

Project Information

4 Q
The project “Lot 1 Transmission Line in Espírito Santo, Minas Gerais, Paraná, Santa Catarina and São Paulo States” is an infrastructure initiative in the Power Transmission sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

"This project entails the construction of a 780 km electricity transmission line spanning the Brazilian states of Espírito Santo, Minas Gerais, Paraná, Santa Catarina, and São Paulo. The initiative also includes building the 525 kV Curitiba Oeste and Abdon Batista 2 substations, as well as extending the 230/138 kV Mascarenhas and 230 kV Aimorés substations. The project aims to strengthen the electrical infrastructure in Paraná and Santa Catarina, while also serving Espírito Santo, the eastern region, the Triângulo Mineiro area, and Alto Paranaíba in Minas Gerais. Approximately 5,866 direct jobs are expected to be generated, with a 60-month timeline for completion. The sponsor, French company ENGIE, secured a 30-year concession for the project through the Engie Brasil Transmissão Consortium, comprising Engie Transmissão de Energia Participações II SA (99.9%) and Engie Brasil Energia (0.01%). The consortium's winning bid of $46.2 million (R$252.4 million) represented a 48.14% discount from the maximum Annual Permitted Revenue (RAP) of $89.1 million (R$486.4 million) set by the regulatory agency. The total project cost is estimated at $550 million (R$3 billion), with a financial close date of September 27, 2024." https://www.gov.br/aneel/pt-br/assuntos/noticias/2024/consorcio-engie-brasil-transmissao-vence-lote-1-do-leilao-de-transmissao-no-2-2024 ; https://en.newsroom.engie.com/news/engie-wins-a-new-concession-to-build-and-operate-around-1000-km-of-transmission-lines-in-brazil-1165e-314df.html ; https://megawhat.energy/transmissao/engie-leva-lote-1-no-leilao-de-transmissao-com-investimentos-em-r-29-bi/ ; https://www.webdisclosure.com/press-release/engie-remporte-une-nouvelle-concession-pour-la-construction-et-lexploitation-denviron-1000-km-de-lignes-de-transmission-au-bresil-N3INB0BgcfM ; https://www.riotimesonline.com/brazilian-energy-auction-engie-taesa-and-cox-win-with-steep-discounts

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data