Lotus Wind Farm - 203 MW
Sector: Wind • Location: Illinois, United States of America
Source: Dodge USA
203 megawatt wind facility in the Modesto, Palmyra, and Scottville area, with up to 52 turbines across more than 16,000 acres. Enough power for 77,500 homes. To use Vestas' V163-4.5 MW turbines. The turbines are scheduled for delivery Q4 2025, with commissioning planned for Q1 2026.
- Status
- Prospective
- Sector
- Wind, Commercial, Road, Residential, Power Generation (CCGT), Raw Materials
- Location
- Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lotus Wind Farm - 203 MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 203 megawatt wind facility in the Modesto, Palmyra, and Scottville area, with up to 52 turbines across more than 16,000 acres. Enough power for 77,500 homes. To use Vestas' V163-4.5 MW turbines. The turbines are scheduled for delivery Q4 2025, with commissioning planned for Q1 2026. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Commercial, Road, Residential, Power Generation (CCGT), Raw Materials |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- NTIA Tribal Broadband Connectivity Program
- Pump Station 3 Replacement
- Reston Town Center Expansion
- 108th Avenue Northeast transit queue jump
- 4520 Barrett Road Tentative Parcel Map and Abandonment
- Abandonment Of Portions Of An I.O.D. And P.U.E. Located Within 4110 Winding Bluff Lane
- Whisper Wind Temporary Hardship Mobile Home
- 4450 Manzanita Ave (Winding Ranch) Pre Application Meeting
