logo

Louis-Saint-Laurent School / STGM Architectes + Ateliers Architecture

Sector: Commercial • Location: Ateliers Architecture

Source: ArchDaily

Project
Closed

The extension, with its wooden structure, integrates harmoniously with the existing building, both in terms of scale and material selection. The new pavilion is primarily clad in clay brick, a highly durable and timeless material. A color palette that contrasts with the existing school ensures a smooth integration while highlighting the contemporary addition to the overall structure. Recesses in t

Project Information FAQ

Project Information

3 Q
The project “Louis-Saint-Laurent School / STGM Architectes + Ateliers Architecture” is an infrastructure initiative in the Commercial sector, located in Ateliers Architecture. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The extension, with its wooden structure, integrates harmoniously with the existing building, both in terms of scale and material selection. The new pavilion is primarily clad in clay brick, a highly durable and timeless material. A color palette that contrasts with the existing school ensures a smooth integration while highlighting the contemporary addition to the overall structure. Recesses in the volume mark and protect the entrances, both at the front façade and the schoolyard. A change of material in these recessed areas helps to break up the volume and create depth in the design of the new building. Red-tinted composite cement panels are used in these areas, providing impact resistance and durability while bringing warmth and friendliness to the school.From the new hall, a passage to the existing building offers a seamless flow through the school, granting access to the learning hub, which is at the heart of the project. Renovations in the existing building have reorganized various areas to clarify the school's layout, such as the administration sector, where the staff room has been relocated closer to the main office and existing entrance.Text description provided by the architects.Designed to provide a living and learning environment tailored to children while maintaining a direct connection to the outdoors, the expansion of the school includes the addition of five preschool classrooms, a learning hub, and a new entrance hall leading to the schoolyard. The original building, constructed in 1959, exhibits typical features of a primary school from that era: a two-story building with a sloped roof and red brick cladding.Generous glazing, both in the hall and classrooms, punctuates the façades and adds lightness to the architectural composition. Finally, the curved shapes present in the design are reflected throughout the project, both in the exterior and interior design. Echoing the rounded forms that characterize the region's landscape, the curve stands out as a distinctive feature of the extension, adding movement and dynamism to the architecture. The project was designed in collaboration with Ateliers Architecture, a local firm.The two classrooms that were somewhat isolated on the ground floor of the original building have been repurposed for arts and music activities. Three new cloakrooms have been added on the ground floor, serving as a filter for different entrances to the schoolyard, thus freeing up the corridors on the upper floors. Additionally, a reorganization of spaces near the gymnasium now allows direct access to the community from outside. Finally, an outdoor classroom has been set up on the roof of the extension to enhance the outdoor spaces.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data