Louisburg Aquatic Center Renovation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Project includes the following Work: Renovate shallow area with new water features. Replace old ductile iron piping. Remove existing drop slide, and replace with new aquatic zip line feature. To provide design, construction documentation and construction administration services to enhance the Louisburg Aquatic Center (LAC).
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Commercial, Government, Metal, Steel
- Location
- Louisburg, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Louisburg Aquatic Center Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: Renovate shallow area with new water features. Replace old ductile iron piping. Remove existing drop slide, and replace with new aquatic zip line feature. To provide design, construction documentation and construction administration services to enhance the Louisburg Aquatic Center (LAC). |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Louisburg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Commercial, Government, Metal, Steel |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
