Louzes Wind Power Plant
Sector: Power Generation (CCGT) • Location: Greece
Source: Vestas
Louzes Wind Power Plant, established in Greece in 2008, features 24 MW of wind power capacity and integrated a 1 MW solar power plant in 2012, becoming a hybrid power plant. It utilizes Vestas’ solutions for wind and solar resource assessment and control strategies.
- Status
- Closed
- Sector
- Power Generation (CCGT), Solar, Wind
- Location
- Greece
- Updated
- 22 Jul 2026
- Source
- Vestas
ConstructChat
Ask ConstructChat about Louzes Wind Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Louzes Wind Power Plant, established in Greece in 2008, features 24 MW of wind power capacity and integrated a 1 MW solar power plant in 2012, becoming a hybrid power plant. It utilizes Vestas’ solutions for wind and solar resource assessment and control strategies. |
Original sector | Energy |
Location
Country | Greece |
Source
Source | Vestas |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Wind |
Article published date | 2025-05-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
