logo

Lovekin Boulevard Resurfacing

Sector: Cement • Location: California, United States of America

Source: Riverside County

Project
Closed

Limits: Seeley Avenue to approximately 4,400 feet north of Seeley Avenue Length: Approximately 4,400 feet District: 4 Community: River Valley

The County of Riverside Transportation Department is proposing to resurface approximately 4,400 feet of Lovekin Boulevard from Seeley Avenue to approximately 4,400 feet north of Seeley Avenue. Lovekin Boulevard is classified as an Arterial Highway in the C

Project Information FAQ

Project Information

4 Q
The project “Lovekin Boulevard Resurfacing” is an infrastructure initiative in the Cement sector, located in California, United States of America. Taiyo aggregates data on it from Riverside County.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Limits: Seeley Avenue to approximately 4,400 feet north of Seeley Avenue Length: Approximately 4,400 feet District: 4 Community: River Valley The County of Riverside Transportation Department is proposing to resurface approximately 4,400 feet of Lovekin Boulevard from Seeley Avenue to approximately 4,400 feet north of Seeley Avenue. Lovekin Boulevard is classified as an Arterial Highway in the County of Riverside’s General Plan. Lovekin Boulevard is a two lane road and currently ranges from 40-52 feet wide with curb along a segment of the roadway. The proposed project will include pulverizing the roadway followed by overlaying with Hot Mix Asphalt (HMA). Additional improvements include: Reconstruction of asphalt concrete dike and overside drain Reconstruction of concrete curb and ADA deficient curb ramp Construction of asphalt concrete driveway Placement of safety edge Striping of roadway, including pavement markers and reflectors Salvage/removal and installation of new signs No additional right-of-way will be required to construct the proposed improvements. The project improvements will be within the existing footprint of the roadway and will raise the existing roadway profile by 0.50 feet.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data